EMC
General Work History

   

  • 02/27/08: Replace ADB 3-1-4 (davidd)
  • 12/29/07: SOURCE CAL: Source calibration run 333 (cawest)
  • 11/05/07: Filter board swap between BF28 & BF29 (chris)
  • 10/04/07: SOURCE CAL: source calibration run 331 (cawest)
  • 08/25/07: SOURCE CAL: Attempted source calibration (cawest)
  • 04/19/07: GMB for EC West Xtal temps recovered (andy/jen/jong/tim)
  • 04/04/07: SOURCE CAL: Source calibration run 328 (cawest)
  • 03/07/07: Update of DQM JAS html pages (aruland)
  • 02/21/07: changed LP scripts so the LP crate is switched off after calib. (mkarbach)
  • 01/26/07: EMC PIN Diode offset voltage adjusted (aruland, timw)
  • 01/25/07: Change EMC PIN diode offset voltage (aruland)
  • 01/18/07: SOURCE CAL: Source Cal Run #325 (aruland, cawest)
  • 01/10/07: SOURCE CAL: Source Cal Run #324 (aruland, cawest)
  • 12/15/06: SOURCE CAL: Source Cal Run #323 (aruland, cawest)