05/06/08
:
ADB 3-1-0 was masked out.
(gjackson)
04/08/08
:
PS 5-0 (BB 10) temp Alarm
(davidd)
02/27/08
:
Replaced ADB 419 with ADB 379 in 3-1-4
(davidd)
02/14/08
:
3-1-4: Masking out ADB
(davidd)
01/19/08
:
PS 5-10 swapped with PS 5-9
(gjackson)
01/24/08
:
7-2
ROM replaced
(cpo)
01/14/08
:
8-9:14
masked out
(jong)
01/09/08
:
3-10 IOB replaced
(graham,david,jong)
01/05/08
:
4-9 diode B masked out
(jong/tim/graham)
01/03/08
:
4-9 bias moved to spare channel
(jong)
12/21/07
:
7-3:
ROM replacement
(Matt)
12/19/07
:
3-10:
Fiber C masked out
(jong)
12/15/07
:
2-10 & 4-9
bias cables returned to their respective home
(jong)
11/26/07
:
ROD: BF - Repaired IOB 2-10.
(gjackson)
11/26/07
:
ROD: BB - Replaced IOB 5-4
(gjackson)
11/24/07
:
ROD: Investigation of fibers with low optical powers
(gjackson)
11/24/07
:
ROD: BF - Re-seated fiber C belonging to 3-10.
(gjackson)
11/21/07
:
ROD: BF - Replaced IOB 3-7 and ADBs 3-7-1 & 3-7-3 & then all of 3-7s ADBs
(gjackson)
11/16/07
:
ROD: BF - Replaced ADBs 1-2-4 & 3-7-1.
(gjackson)
11/16/07
:
ROD: BF - Replaced IOBs 1-2 & 3-7.
(gjackson)
11/15/07
:
EW Radiation monitoring board was replaced.
(gjackson)
11/14/07
:
ROD: BF - Replaced IOB 3-10.
(gjackson)
11/14/07
:
ROD: EC - Replaced IOB 9-9.
(gjackson)
11/14/07
:
ROD: EC - Replaced ADBs 9-2-(1,2&3) & IOB 9-2.
(gjackson)
10/20/07
:
ROM 3-0 ethernet card changed.
(gjackson)
10/29/07
:
ROM 8-4 swapped with 8-5
(cpo)
10/30/07
:
Full ecal on crates 2, 4 & 8
(gjackson)
10/29/07
:
ROD: BF - Replaced IOB 8-4
(gjackson)
10/29/07
:
ROD: BF - Replaced IOB 2-10
(gjackson)
10/29/07
:
ROD: BB - Replaced ADB 4-8-4
(gjackson)
10/28/07
:
Full ecal on all but Crate 8.
(gjackson)
10/25/07
:
Pedestal calibration.
(gjackson)
10/25/07
:
ROD: EC - Replaced ADB 9-6-0
(gjackson)
10/25/07
:
ROD: BB - Replaced ADB 4-4-0 & 7-3-5 And IOB 7-3
(gjackson)
10/25/07
:
ROD: Replaced ADB 3-5-5
(gjackson)
10/25/07
:
Swapped EC E LV PS 03 for a spare
(cawest)
10/24/07
:
Full ecal
(gjackson)
10/24/07
:
Pedestal calibration
(gjackson)
10/24/07
:
Crate modification complete
(gjackson)
10/23/07
:
Pedestal calibration
(gjackson)
10/23/07
:
BF1 Modified & Ready, BF0 Modified but awaiting filter boards.
(gjackson)
102207
:
EC full ecal
(gjackson)
102207
:
Full Pedestal calibration
(gjackson)
102207
:
BF3 Modification.
(gjackson)
10/22/07
:
Reseated and power cycled EC East 03
(cawest)
101907
:
A full calibration was performed on BB
(gjackson)
101907
:
Clean filter boards were fitted to BB3, EE & EW
(gjackson)
10/18/07
:
Pedestal calibration.
(gjackson)
10/18/07
:
EE & EW crates modified and prepared. TRB crate modified and ready.
(gjackson)
10/17/07
:
Pedestal calibration
(gjackson)
10/17/07
:
BB2 Crate modification & BB3 prep.
(gjackson)
10/17/07
:
Pedestal calibration
(gjackson)
10/17/07
:
BB1 Crate modification
(gjackson)
10/16/07
:
Pedestal calibration
(gjackson)
10/16/07
:
BB0 Crate modification
(gjackson)
09/24/07
:
LV PS BF 35 replaced
(cawest)
08/30/07
:
Pedestal Calibration
(tim/jen)
08/30/07
:
Pedestal calibration
(jen/tim)
08/23/07
:
PS crate for BF Q0 replaced
(elex team, Mike P & Ray R.)
07/10/07
:
TPCs swapped between crates 0 and 1
(jong)
07/10/07
:
Calibrated all of EMC.
(gjackson)
07/10/07
:
8-1 & 8-1-0 replaced
(gjackson)
07/10/07
:
TRB BF0 replaced
(gjackson)
07/02/07
:
0-5 ROM swapped with 0-7
(jong)
06/28/07
:
8-1-0 died. again.
(timw)
06/27/07
:
New pedestal Calibration
(timw)
06/27/07
:
Replaced LV PSU for TRB BF0
(timw)
06/27/07
:
Swapped LV PSUs 0-5 and 0-6.
(timw/gjackson)
06/25/07
:
Replaced PSU for EC IOB W-3
(timw)
06/25/07
:
Replace power supply for TRB BB0
(timw)
06/25/07
:
1-6 damages
(gjackson)
06/21/07
:
Calibrated all of EMC.
(gjackson)
06/21/07
:
8-1-0 Recovered.
(gjackson)
06/21/07
:
2-9-0 was swapped.
(gjackson)
06/21/07
:
7-2 ROM swapped
(gjackson)
05/25/07
:
2-9-0 Masked
(jen)
05/14/07
:
8-1-0 Masked
(jen)
05/11/07
:
7-4-4, 4-9-0 replaced
(jen,jong,tim)
05/09/07
:
7-4-4 masked out
(jong)
05/01/07
:
9-1-0 & 2-6-0 replaced
(andy/jen/jong)
04/26/07
:
9-1-0 (ch 8-11) masked
(jong)
04/21/07
:
Swapped power supplies for 1-5 and 1-6. New peds for 0 & 1.
(tim)
04/19/07
:
4-9 ROM replaced
(cpo)
04/19/07
:
CALIB: pedestal & ecal on EC (9-10-3 recovery; 9-1-0 notes)
(jong)
04/18/07
:
7-9, 1-6 damages
(jong/tim/odf)
04/10/07
:
Elex calib (except 2-6, 9-10)
(jen,jong,tim)
04/10/07
:
5-7-0 Unmasked
(jen,jong,tim)
04/10/07
:
ROD: TRB BF0 Replacement
(jen/jong/tim)
03/29/07
:
ROMs 0-2, 0-5, 0-9 swapped
(jong)
03/29/07
:
ROD Summary (03/26/07-03/28/07)
(andy,jen,jong,tim)
03/29/07
:
5-7-0 Masked out
(andy,jen,jong,tim)
03/28/07
:
ROD: FW: 1-3, 1-5, 2-9
(andy,jen,jong,tim)
03/28/07
:
ROD: FE: 0-2, 0-5, 0-9, 3-10
(andy,jen,jong,tim)
03/28/07
:
ROD: BE: 4-9 IOB replacement
(andy,jen,jong,tim)
03/28/07
:
ROD: TRB BB01 Replacement
(andy,jen,jong,tim)
03/28/07
:
ROD: TRB PS crate replacement
(andy,jen,jong,tim)
03/28/07
:
Masked ADB 5-7-0
(timw)
03/28/07
:
masking noisy channels
(timw)
02/22/07
:
0-2-4 Masked out
(jong)
02/14/07
:
Masked diode A on 8-1:37
(jen/tim)
02/13/07
:
Masked diode A on 6-5:57 and 9-8:5
(jen/tim)
02/13/07
:
Complete calibration of emc after rod
(Jen)
02/13/07
:
Replaced (6-4-1, 6-9-1, 6-10-4, 9-10-0) and swapped (2-9-0,2-9-1) ADBs during ROD
(tim/jong/jen/andy)
02/12/07
:
Masking ADB 9-10-0
(tim/andy/jen)
02/09/07
:
Unmasked 6-10-4
(jong)
02/09/07
:
Pedestal on all crates and ecal on cr 2
(jong)
02/09/07
:
Swapped LV PS BF08 for a spare
(aruland)
02/08/07
:
pedestal calibration
(jong)
02/08/07
:
7-9 ROM swapped with 7-8
(jong)
02/08/07
:
Masked out 6-10-4
(jong)
02/05/07
:
ROMs replaced for 7-2 and 4-9
(jong)
02/05/07
:
Masked out 9-8:17
(jong)
01/31/07
:
ROM 0-3, 4-9, 7-7 repaired
(jong)
01/31/07
:
calibrated cr 7 and performed pedestal on all crates
(jong)
01/31/07
:
Replaced 7-9-0
(jong)
01/29/07
:
4-9 Out of Sync problem
(jong)
01/29/07
:
masked out 1-5:43 and disabled A on 9-8:32
(jong)
01/27/07
:
Power cycling on 6-10 and 0-2
(timw)
01/25/07
:
Pedestal & investigate 9-10-03 & 7-9-2
(jong)
01/20/07
:
Calibrate cr 6 (6-4-01)
(jong)
01/19/07
:
ROM replacements (1-7, 1-10, 5-4)
(jong)
01/19/07
:
Pedestal (9-10-03 acting up)
(jong)
01/17/07
:
ROD: Pedestal & ecal on crates 0 & 2
(jong)
01/17/07
:
ROD: 0-2, 2-6, 2-10
(jong)
01/08/07
:
Elex calib marking the end of this long recabling process
(jong)
01/08/07
:
Recabling (Debugging...)
(jong)
01/04/07
:
Recabling (Debugging...)
(jong)
01/03/07
:
Recabling (Debugging...)
(jong)
01/02/07
:
Recabling (Debugging...)
(jong)
12/15/06
:
Recabling (Debugging...)
(jong)
12/14/06
:
Recabling (Debugging...)
(jong)
12/12/06
:
Recabling (Debugging...)
(jong)
12/11/06
:
Recabling (Debugging...)
(jong)
12/06/06
:
Recabling Day #9
(jong)
12/05/06
:
Recabling Day #8
(jong)
12/04/06
:
Recabling Day #7
(jong)
12/02/06
:
Recabling Day #6
(jong)
12/01/06
:
Recabling Day #5
(jong)
11/30/06
:
Recabling Day #4
(jong)
11/29/06
:
Recabling Day #3
(jong)
11/28/06
:
Recabling Day #2
(jong)
11/27/06
:
Recabling Day #1
(jong)