This page automatically updates every 10 minutes.   Last Update: Aug 28 (Thu): 06:40:13

  General Information

  • DRC is NOT RUNNABLE and INJECTABLE.
  • BaBar is currently Inj Req Deny
  • PEPII is currently No Beam
  • Current Run number is 0
  •   DRC Status

    High Voltage Wiener Crates Background Gas Status SIAMS Water B field
     
    ( Red=MAJOR   Yellow=MINOR   Green=NO_ALARM   White=NO_CONNECT   Black=reading failed )

    Water Level -0.0225826 m ,    SOB Humidity -32.7736 ,    IP temp: 26.9038 Celsius

    Dew point in sector 6 -76.8247 ,   
    nitrogen flow in sector 6 / 1011.7663 ,   
    Dew point in sector 5 -67.5747 ,   
    Dew point in sector 7 -81.3664 ,   
    IR2 floor temperature 20.9 ,   
    Relative humidity in the area 35.9298 ,   
    DIRC chiller temperature -272.5 ,   
    Scalers : 0 1 2 3 4 5 6 7 8 9 10 11 INT*1.e5
    (Hz) 0 0 0 0 0 0 0 0 0 0 0 0

    SOB_Humidity
    IP_Temperature
    Dew Pt 6
    N2 Fl 6 / 10
    Dew Pt 5
    Dew Pt 7
    IR2 Floor T
    Rel Hum Area
    Chiller temp
                TIME (HOUR)  

    SOB_Humidity
    IP_Temperature
    will keep 10 weeks
                TIME (Day)  

    will keep 1 week
    last day
    Scaler0
    Scaler1
    Scaler2
    Scaler3
    Scaler4
    Scaler5
                TIME (HOUR)  

    Scaler6
    Scaler7
    Scaler8
    Scaler9
    Scaler10
    Scaler11
    ScalerINT*1.e5
                TIME (HOUR)  


    Page author: Denis Bernard (back to DIRC , DIRC Operations , GnuPlot)